template_version,criterion_id,decision_area,buyer_question,acatian_evidence_to_capture,roebling_public_evidence_to_verify,evidence_state,first_party_source,source_reviewed_on,missing_information_to_request,acceptance_criterion,weight,acatian_score,roebling_score,decision_owner,status,notes 1.0,GUIDE-001,Use instructions,How should this scorecard be used?,Capture dated source links and direct written vendor responses,Attribute every public statement and keep unknowns open,method_note,https://roebling.com/,2026-10-14,Obtain current written confirmation from both providers,Approve criteria and weights before scoring,,,,Procurement lead,Open,Acatian publishes this template and has a commercial interest; it is not affiliated with or endorsed by Roebling 1.0,MODEL-001,Purchase type,Are we buying customer-operated software or an engineering engagement or both?,Document software access and any separately scoped services,Roebling publicly describes an AI-native engineering partner plus connected platform,vendor_documented,https://roebling.com/,2026-10-14,Current contracting model and included services,Required purchase type is confirmed in writing,,,,Procurement lead,Open,Vendor-documented is not independent performance verification 1.0,STAGE-001,Project stage,Which FEL or operating decision must the engagement support?,Map verified Acatian scope to the required stage,Roebling publicly describes work from FEL-0 through FEL-3 and FID,vendor_documented,https://roebling.com/,2026-10-14,Exact stage deliverables exclusions and review gates,Required decision stage and deliverables are in the statement of work,,,,Project sponsor,Open,Do not infer certification or design authority from marketing copy 1.0,SCOPE-001,Process scope,Which unit operations and plant boundaries are included?,Provide an editable scope and system-boundary register,Roebling lists biomanufacturing deliverables including mass and energy balances and equipment definition,vendor_documented,https://roebling.com/industries/biomanufacturing,2026-10-14,Current unit-operation coverage and exclusions,All critical operations and offsites have a written disposition,,,,Process lead,Open,Ask for an example that matches the intended process rather than a generic demo 1.0,BAL-001,Mass and energy balances,Can one authorized reference case be reconciled?,Provide balance residuals assumptions sources and tolerances,Roebling lists mass and energy balances for biomanufacturing,vendor_documented,https://roebling.com/industries/biomanufacturing,2026-10-14,Reproducible benchmark method and output detail,Pre-agreed component and energy tolerances are met or explained,,,,Process engineer,Open,Use customer-authorized inputs only 1.0,SCHED-001,Scheduling and utilization,Does the workflow model batch schedules occupancy and shared resources?,Provide finite-capacity schedule outputs and conflict checks,Roebling lists batch schedules and utilization for biomanufacturing,vendor_documented,https://roebling.com/industries/biomanufacturing,2026-10-14,Resource constraints calendars cleaning holds and export detail,No unresolved hard resource conflicts in the benchmark,,,,Scheduler,Open,Compare the same campaign calendar and release basis 1.0,UTIL-001,Utilities and cleaning,Are utilities and CIP or SIP linked to the process schedule?,Provide quantity peak timing and evidence for each utility,Roebling lists utilities and CIP in its public biomanufacturing scope,vendor_documented,https://roebling.com/industries/biomanufacturing,2026-10-14,Utility definitions peak interval and cleaning-resource assumptions,All critical utility loads use an agreed basis and time interval,,,,Utilities engineer,Open,Do not compare annual totals to instantaneous peaks 1.0,TEA-001,Economics,Can cost of goods CAPEX and OPEX be traced to one process basis?,Provide line-item source currency year scope and formulas,Roebling lists cost of goods and capital and operating cost outputs,vendor_documented,https://roebling.com/industries/biomanufacturing,2026-10-14,Estimate class cost basis contingency geography and owner costs,Every material cost driver and exclusion is traceable,,,,TEA lead,Open,Vendor estimates are not customer outcomes or savings guarantees 1.0,LCA-001,Life-cycle assessment,Is an LCA deliverable required and what exact boundary and method apply?,Provide foreground inventory provenance background-data status and method version,No complete LCA workflow was established from the cited pages in this template review,not_resolved_by_public_source,https://roebling.com/industries/biomanufacturing,2026-10-14,Goal and scope functional unit inventory source LCIA method uncertainty and review status,Required environmental deliverable is defined without calling screening a full LCA,,,,LCA lead,Open,Verify current scope directly and do not treat absence from a reviewed page as absence of capability 1.0,ACCESS-001,Model access,Who can edit rerun branch and review the live model?,Demonstrate roles branches version history and handoff terms,Roebling describes a connected living model but public access and editing terms require confirmation,partly_documented,https://roebling.com/,2026-10-14,Named user permissions edit rights retention and post-engagement access,The required team can reproduce and govern the decision after handoff,,,,Model owner,Open,Record product terms and service terms separately 1.0,OWN-001,Ownership and intellectual property,Who owns inputs model configuration outputs and derived methods?,Provide current contractual ownership and export terms,Ownership and intellectual-property terms were not resolved by the cited public pages,not_resolved_by_public_source,https://roebling.com/,2026-10-14,Contract language for inputs outputs model access derivatives and termination,Rights are acceptable to legal and project owners before data transfer,,,,Legal owner,Open,Do not infer ownership from access to a workspace 1.0,DATA-001,Security and deployment,Where is project data processed stored and backed up?,Provide current security controls subprocessors regions retention and deletion,Security and deployment terms were not resolved by the cited public pages,not_resolved_by_public_source,https://roebling.com/,2026-10-14,Security documentation deployment options incident terms and data deletion evidence,Security review passes for the intended data classification,,,,Security owner,Open,Verify current evidence directly with each provider 1.0,EXPORT-001,Exports and interoperability,Which source and result formats can be lawfully imported or exported?,List tested public formats and explicitly exclude unsupported proprietary compatibility,Export and interoperability detail requires current vendor confirmation,not_resolved_by_public_source,https://roebling.com/,2026-10-14,Format list schema version fidelity tests and API terms,Required outputs open independently and preserve critical values and topology,,,,Integration lead,Open,Never infer proprietary file compatibility 1.0,REVIEW-001,Engineering responsibility,Who reviews calculations and who carries design responsibility?,Document software boundary reviewer roles and any separately contracted engineering,Roebling publicly positions itself as an engineering partner,vendor_documented,https://roebling.com/,2026-10-14,Named disciplines review deliverables stamps if any and liability boundary,Responsibility and approval authority are explicit in writing,,,,Engineering manager,Open,Software output does not replace qualified engineering review 1.0,VALID-001,Validation,How will calculations be accepted before use in a decision?,Provide benchmark inputs residuals versioned results and deviation log,Public pages describe deliverables but project-specific acceptance criteria require agreement,project_specific_confirmation_required,https://roebling.com/industries/biomanufacturing,2026-10-14,Acceptance protocol tolerances reviewer and corrective-action process,All blocking checks pass or receive written disposition,,,,Quality reviewer,Open,Define tolerances before seeing comparative results 1.0,COMM-001,Commercial terms,What are the full implementation adoption service and renewal costs?,Provide current written offer and separate software service onboarding and optional costs,Current project-specific commercial terms require direct confirmation,project_specific_confirmation_required,https://roebling.com/,2026-10-14,Price basis term renewal usage limits travel support and termination,Total cost boundary and non-break-even case are approved,,,,Finance owner,Open,Do not rely on stale or third-party pricing 1.0,EXIT-001,Handoff and exit,What can the team retain and operate if the contract ends?,Provide export package documentation retention and deletion terms,Post-engagement handoff detail requires current vendor confirmation,not_resolved_by_public_source,https://roebling.com/,2026-10-14,Data export model access archival support and deletion certificate,Exit plan preserves required evidence and meets retention policy,,,,Project owner,Open,Test the exit package before a long-term commitment 1.0,DEC-001,Decision,Which option best fits the approved responsibility and evidence boundary?,Summarize scored evidence gaps risks and conditions,Use direct provider evidence and the same benchmark for both options,decision_record,https://roebling.com/,2026-10-14,Resolve blocking unknowns before recommendation,Written decision cites evidence and records dissent or uncertainty,,,,Project sponsor,Open,This template does not recommend either provider