Keep the plant, the model, and the evidence synchronized.
Acatian links the process graph, dynamic states, equipment and schedule states, measured production data, assumptions, uncertainty, model versions, and review evidence around one defined engineering decision.
Map historian tags, batches, assays, recipes, alarms, maintenance, quality records, units, timestamps, and ownership.
04 · Governance
Fit for decision
Track residuals, drift, calibration range, versions, approvals, missing evidence, and the response to model-plant divergence.
Twin levelWhat Acatian representsWhat must be proven
Design twinFlowsheet, balances, equipment, schedule, TEA/LCA and scenariosAuthorized design basis, reconciliation and sensitivity coverage
Calibrated twinParameters fitted to identified batches and operating conditionsResiduals, independent validation data and validity domain
Operational twinTime-aligned plant state, prediction, monitoring and alertsSecure connectivity, data quality, drift handling and qualified response
Closed-loop controlNot a public Acatian software claimSite-approved DCS/PLC integration, interlocks, validation and operational ownership
Plant contextAssets, utilities, cleaning, rooms, schedules, material flows, and control boundaries remain visible.Model contextEvery observation and recommendation resolves to equipment, streams, parameters, sources, and a versioned model change.