SuperPro Designer migration

Benchmark one authorized model before changing your workflow.

Keep the existing approved model as the baseline. Reconstruct one representative process from customer-owned exports and assumptions, reconcile the results, and evaluate collaboration, traceability, scenario speed, and decision outputs.
Acatian workspace used to reconstruct and benchmark an authorized reference process
Parallel validation protects the existing engineering basis while testing a modern workflow.
01Select

Choose one representative, company-owned process and freeze the reference outputs.

02Reconstruct

Map permitted streams, equipment, operations, costs, schedule, and source assumptions.

03Reconcile

Explain differences in balances, duties, occupancy, economics, and environmental results.

04Evaluate

Measure variant speed, review effort, traceability, exports, and collaboration.

05Decide

Expand only the workflows that pass predefined technical and governance criteria.

Reconciliation matrix

Accept each model layer independently.

Set the basis, evidence source and tolerance before reconstruction. A passing headline output does not excuse an unexplained component, timing or costing difference.
Model layerEvidence to freezeAcceptance question
Components and streamsCustomer-owned stream table, components, phases, units and declared boundariesDo inlet, outlet, recycle and accumulation residuals meet the agreed absolute and relative tolerances?
Yield and recoveryReaction basis, step yields, losses, purge and product-quality boundaryAre differences caused by assumptions, rounding, property methods or implementation—and are they explained?
Equipment and utilitiesSizing basis, working volume, duty, cycle count, heat and utility loadsDoes every selected item meet the same design basis and constraint screen?
Timing and occupancyOperation durations, predecessors, holds, setup, CIP/SIP and shared-resource calendarsDo event timestamps, equipment occupancy, batches per year and bottlenecks reconcile?
Economics and COGSCurrency year, region, costs, installation factors, labor, utilization and good-product denominatorCan every CAPEX, OPEX and unit-cost delta be traced to a named basis difference?
Environmental inventoryFunctional unit, boundary, allocation, foreground flows and authorised background factorsDo material, energy, water, waste and direct-emission inventories reconcile before impact comparison?

Download the complete migration reconciliation matrix (CSV).

Migration assessment

Define the comparison before sharing any process data.

This request collects contact and evaluation scope only. Do not submit confidential process files through this form.
Acatian model readiness view used to compare migration completeness
Acceptance, not promisesClose balances, explain residuals, verify equipment duty, reproduce the schedule, trace costs, and list every unresolved gap.

Acatian-published comparison. SuperPro Designer is a trademark of its respective owner; no affiliation or endorsement is claimed. Source-derived diagrams are not numerically converted or validated SuperPro models. Original simulator binaries and manuals are not distributed by the model library.